tradingkey.logo

TABLE-North Sea gas maintenance schedule: Adds Atwick outage

ReutersOct 10, 2025 6:29 AM

- The following is a schedule of maintenance work on gas infrastructure, mainly in the North Sea.

The table is arranged by outage start date.

Volumes are in standard million cubic metres per day (mcm/d) or gigawatt-hours per day (GWh/d) unless otherwise indicated.

OPERATOR

LOCATION

OUTAGE DATES

OUTAGE DESCRIPTION/IMPACT

2021 OUTAGES

Fluxys

Interconnector

Jul 6, 0600 CET - Mar 31, 2028 0600 CET

UK import capacity reduction to 31,392,673 kWh/h; unplanned equipment maintenance

2024 OUTAGES

SSE

Atwick

Apr 9, 2024 0850 BST- Jun 26, 2026 0500 BST

45 GWh/d planned withdrawal unavailability; phase 6 reduction

Kistos Energy Storage

Hole House

Jul 06, 2024 1359 BST - Mar 31, 2026 1359 BST

0.5231 TWh Planned other unavailability

Hole House Gas Storage facility will not be returned to commercial operation. The plant will still be required to do gas withdrawals and small injections during the decommissioning process, which will be completed by the end date specified.

2025 OUTAGES

INEOS

FPS system

Q2 (Apr)

Train 1 pit stop is planned, with forecast duration of two to three (2-3) weeks

SSE

Atwick

Jun 24, 1042 BST - Oct 01, 1800 BST

0.481 TWh/ Planned storage unavailability

TAQA

UGS Bergermeer

Aug 16, 0400 CET - Sep 28, 0400 CET

146 to 178 GWh/d; Gas treatment plant unavailability

TAQA

UGS Bergermeer

Aug 16, 0400 CET - Sept 28, 0400 CET

-146 to -178 GWh/d; Gas treatment plant unavailability

Gassco

St. Fergus

Aug 19, 0600 CET - Sep 29, 0600 CET

-32.8 mcm/d; corrective maintenance

INEOS

FPS system

Q3

Hound Point 1 Outage is being planned, with forecast duration of two to three (2-3) weeks

Gassco

Gulfaks

Sep 01, 0600 CET - Oct 01, 0600 CET

-11.5 mcm/d; Yearly maintenance

SSE +

Aldbrough

Sep 01, 0830 BST - Oct 13, 0500 BST

71.1 GWh/d; Unplanned injection unavailability

Gassco

Zeebrugge

Sep 02, 0600 CET - Sep 26, 0600 CET

42.1 mcm/d; yearly maintenance

Kistos Energy Storage Ltd

Hill Top

Sep 04, 0500 GMT - Oct 06, 0500 GMT

0.6477 TWh Planned storage unavailability

Perenco #

Bacton

Sep 07, 0600 BST - Oct 10, 1800 BST

2.3 mcm/d planned gas treatment plant unavailability

Spirit Energy

Barrow (North Terminal)

Sep 07, 0600 BST - Oct 13, 2200 BST

6 mcm/d planned unavailability

Scottish Power

Hatfield Injection

Sep 14, 0500 BST - Oct 17, 1700 BST

20 GWh/d planned injection unavailability; 20GWh/d

planned withdrawal unavailability

Gassco

Kårstø

Sep 18, 0600 CET - Oct 05, 0600 CET

19.6 mcm/d; Yearly maintenance

Perenco Gas Co

Perenco Bacton

Sep 24, 0000 BST - Sep 26, 1200 BST

7 mcm/d; planned gas production field unavailability

Total EP UK

Bacton SEAL (Elgin Franklin)

Sep 24, 0000 BST - Sep 26, 1200 BST

4.8 mcm/d, planned gas production field unavailability

Ithaca Energy UK Ltd

Cygnus

Sep 24, 0715 BST - Sep 26, 1800 BST

4.3 mcm/d, unplanned gas production field unavailability

Gassco

Karsto

Sep 24, 0600 CET - Sep 25, 0600 CET

-67.6 mcm/d; yearly maintenance

Gassco

Kollsnes

Sep 19, 0600 CET - Nov 06, 0000 CET

14 mcm/d; unplanned maintenance

Gassco

St. Fergus

Sep 27, 0600 CET - Oct 11, 0600 CET

12.8 to 32.8 mcm/d; corrective maintenance

Gassco

Karsto

Oct 01, 0600 CET - Oct 15, 0600 CET

19.6 mcm/d; yearly maintenance

Gassco

Karsto

Oct 07, 0600 CET - Oct 09, 0600 CET

15.6 mcm/d; yearly maintenance

TAQA

UGS Bergermeer

Oct 04, 0400 CET - Oct 12, 0400 CET

-415 to -487 GWh/d; gas treatment plant unavailability

Gassco

Karsto

Oct 05, 0600 CET - Oct 09, 0600 CET

12.6 mcm/d; yearly maintenance

KN Energies

Klaipeda LNG

Oct 06, 0400 CET - Oct 09, 0400 CET

117 GWh/d; Regasification plant unavailability

Gassco

St. Fergus

Oct 09, 0600 CET - Oct 10, 0600 CET

18.8 mcm/d; yearly maintenance

SSE+

Atwick

Oct 09, 1815 BST - Oct 10, 1800 BST

0.238 GWh/d; Unplanned storage

Gassco

Oseberg

Oct 13, 0400 CET - Oct 15, 0400 CET

-25 mcm/d; yearly maintenance

KN Energies

Klaipeda LNG

Oct 13, 0400 CET - Oct 16, 0400 CET

117 GWh/d; Regasification plant unavailability

TAQA

UGS Bergermeer

Oct 12, 0400 CET - Oct 18, 0400 CET

-28.8 GWh/d injection unavailability; Compressor station unavailability

Gassco

Oseberg

Oct 16, 0600 CET - Oct 17, 0600 CET

-27.5 mcm/d; yearly maintenance

SSE

Aldbrough

Oct 16, 1000 BST - Oct 16, 1400 BST

287.78 GWh/d; Unplanned withdrawal unavailability

SSE

Atwick

Nov 10, 1600 BST - Dec 04, 1800 BST

0.391 GWh/d; planned storage unavailability

Gassco +

Oseberg

Oct 19, 0600 CET - Oct 22, 0600 CET

27.5 mcm/d; yearly mainenance

Kistos Energy Storage Ltd

Hill Top

Oct 21, 0500 GMT - Oct 22, 1800 GMT

0.6477 TWh Planned unavailability

Kistos Energy Storage Ltd

Hill Top

Oct 22, 0800 GMT - Oct 22, 1800 GMT

0.6477 TWh Planned unavailability

Gassco

Troll

Nov 19, 0600 CET - Nov 21, 0600 CET

12-130.6 mcm/d; Yearly maintenance

Kistos Energy Storage Ltd

Hill Top

Oct 23, 1309 GMT - Oct 23, 1800 GMT

0.6477 TWh Planned unavailability

Gassco

Nyhamna

Nov 17, 0600 CET - Dec 01, 0600 CET

19.8 mcm/d; yearly maintenance

Kistos Energy Storage Ltd

Hill Top

Nov 24, 0500 BST - Nov 25, 1800 BST

0.6477 TWh; Planned storage unavailability

Gassco

Visund

Dec 01, 0600 CET - Dec 03, 0600 CET

-15.1 mcm/d; yearly maintenance

INEOS

FPS system

2025

The Old Lock Berth Outage will take place

2026 OUTAGES

Gassco

Karsto

Jan 05, 0600 CET - Jan 14, 0600 CET

-15.6 mcm/d; Yearly maintenance

SSE

Aldbrough

Mar 12, 0500 BST - Mar 31, 1800 BST

0.323 TWh to 0.432 TWh; Planned storage unavailability

Gassco

Aasta Hansteen

Mar 18, 0600 CET - Mar 22, 0600 CET

-19.2 mcm/d; yearly maintenance

Gassco

Nyhamna

Mar 15, 0600 CET - Mar 22, 0600 CET

50.8 mcm/d; yearly maintenance

Gassco

Troll

Mar 20, 0600 CET - May 28, 0600 CET

-14.0 to 127.4 mcm/d; yearly maintenance

Gassco

Troll

Apr 09, 0600 CET - Apr 22, 0600 CET

-13.0 mcm/d; yearly maintenance

Gassco

Troll

Apr 22, 0600 CET - May 01, 0600 CET

-13.0 to 98.0 mcm/d; yearly maintenance

Gassco

Oseberg

May 01, 0600 CET - May 29, 0600 CET

27.5 mcm/d; Yearly maintenance

Gassco

Troll

May 20, 0600 CET - May 22, 0600 CET

-37 to -125.4 mcm/d; yearly maintenance

Gassco

Visund

May 20, 0600 CET - May 22, 0600 CET

15.1 mcm/d; yearly maintenance

Gassco

Fields delivering into SEGAL

Jun 02, 0600 CET - Jun 09, 0600 CET

-13.9 mcm/d; yearly maintenance

Gassco

Nyhamna

May 25, 0600 CET - May 29, 0600 CET

14.8 mcm/d; yearly maintenance

Gassco

Troll

May 30, 0600 CET - Jun 04, 0600 CET

-42.4 to -16 mcm/d; Yearly maintenance

Gassco

Nyhamna

Jun 01, 0600 CET - Jun 05, 0600 CET

14.8 mcm/d; yearly maintenance

Gassco

Ormen Lange

Jun 01, 0600 CET - Jun 05, 0600 CET

15.7 mcm/d; yearly maintenance

Gassco

Visund

Jun 09, 0600 CET - Jun 11, 0600 CET

-15.1 mcm/d; yearly maintenance

Gassco

Nyhamna

Jun 09, 0600 CET - Jun 13, 0600 CET

14.8 mcm/d; yearly maintenance

Gassco

Nyhamna

Jun 16, 0600 CET - Jun 20, 0600 CET

14.8 mcm/d; yearly maintenance

Gassco

Sleipner

Aug 28, 0600 CET - Sep 22, 0600 CET

-13.1 mcm/d; yearly maintenance

Gassco

Troll

Aug 29, 0600 CET - Sep 16, 0600 CET

-13.0 mcm/d; yearly maintenance

Fluxys

Interconnector

Sep 1 - Sep 20

Planned maintenance shutdown

Gassco

Kollsnes

Sep 06, 0600 CET - Sep 19, 0600 CET

26.0 mcm/d; yearly maintenance

Gassco

Aasta Hansteen

Sep 15, 0600 CET - Sep 17, 0600 CET

-16.1 mcm/d; yearly maintenance

Gassco

Nyhamna

Sep 15, 0600 CET - Sep 22, 0600 CET

51,8 mcm/d; yearly maintenance

Gassco

Asgard

Sep 23, 0600 CET - Sep 24, 0600 CET

-29.3 mcm/d; yearly maintenance

Gassco

Kristin

Sep 23, 0600 CET - Sep 24, 0600 CET

11.5 mcm/d; yearly maintenance

Gassco

Oseberg

Sep 23, 0600 CET - Sep 30, 0600 CET

-13.5 mcm/d; yearly maintenance

Gassco

Oseberg

Oct 10, 0600 CET - Oct 23, 0600 CET

-27.5 mcm/d; yearly maintenance

Gassco

Visund

Dec 01, 0600 CET - Dec 02, 0600 CET

-14.8 mcm/d; yearly maintenance

NOTES:

  • To see all Gassco outages, please click https://bit.ly/3rQojCd

  • CET - Central European Time (GMT +1 or GMT +2, depending on time of the year)

  • * Capacity loss attributable to separate caverns

  • + indicates new addition

  • # indicates revision

Disclaimer: The information provided on this website is for educational and informational purposes only and should not be considered financial or investment advice.